Date: 2014-2016
Funding: AFD
Contracting authority’s representative: Union des Comités d’Eau de Mohéli (UCEM)
Type of operation: Drilling and water collection - Treatment and purification
Construction and extension of the water supply and distribution network for 10 villages in the Djandro region:
- 50 km of HDPE-steel pipes (NPS 40 – 100 mm)
- 4 new river catchments
- 11 metal tanks (50 – 220 m3)
- 12 treatment units: 5 sand filters and 7 chlorination systems 6 raw water intakes
- Rehabilitation of 6 raw water intakes and 3 reinforced concrete reservoirs (up to 100 m3)