Date: 2012-2014
Funding: AFD
Drinking water conveyance for the Sima peninsula on the island of Anjouan:
Construction of a conveyance and discharge network: 22 km in cast iron and HDPE (NPS 80 – 200)
Construction of an HDPE distribution network: supply and laying of 20 km of pipes (NPS 50 – 100)
Construction of new structures:
- 6 reservoirs (50 m3 – 300 m3)
- 1 pumping station (40 m3/h) with a TDH of 150 m
- 1 water catchment
- 2 treatment plants: 1,100 m3/d with physico-chemical treatment
- and 365 m3/d with a sand filter
- 1 x 10 m3 head pond
Construction of 530 private connections and 30 standpipes
Rehabilitation of existing structures (4 water catchments – 3 reservoirs)